| A full variety of ranges and accessories available | |
|---|---|
| 1. Item: | Push Back Pallet Racking System |
| 2. Style: | Quick access, Adjustable |
| 3. Material: | Grade Q235 (or SS400) Q345 |
| 4. Certification: | CE / ISO9001 |
| 5. Standard Color: | Blue (RAL5017), Orange (RAL2004), Green (RAL6000), Light Grey (RAL7035), Yellow (RAL1037) |
| 6. Adjustable Pitch: | N/A |
| 7. Access Style: | High accessibility & selectivity |
| 8. Finishing: | Powder Coated or Galvanized |
| 9. Application Environment: | Normal Temperature or Freezer |
| 10. Design Service: | CAD service available |
| 11. Back-up Service: | Installation Drawing / On Site Instruction |
| 12. MOQ: | 1 unit |
| 13. Lead time: | 3 weeks for 2*40' container |
| 14. Standard package: | Palletized, Export-Purpose Packaging |
| 15. Container Load: | 10-15 tons / 1*20' container, 20-25 tons / 1*40' container |
| 16. Trade Term: | EXW / FOB / CNF / CIF |
Push back pallet racking is a high-density dynamic storage solution where pallets rest on nested carts riding on inclined rails. When a new pallet is loaded, it gently pushes the preceding pallet back. When a pallet is unloaded, gravity rolls the subsequent pallet smoothly forward to the pick face, operating on a Last-In, First-Out (LIFO) inventory rotation.
Yes. Our push back racking systems are engineered for both normal ambient warehouse temperatures and low-temperature cold storage or freezer environments. We provide specialized coatings and materials suited to resist condensation and cold-room conditions.
The system components are constructed using high-strength steel grades Q235 (equivalent to SS400) and Q345. Production meets rigorous international structural and safety criteria, fully certified by CE and ISO9001 standards.
Yes, full custom CAD layout services are available. Our engineering team designs warehouse configurations based on your pallet dimensions, load weights, building ceiling height, and forklift specifications to maximize storage capacity.
The Minimum Order Quantity (MOQ) is 1 unit. The standard lead time for manufacturing is approximately 3 weeks for an order volume equivalent to two 40-foot containers.
Every shipment includes complete installation drawings, component identification guides, and load capacity charts. On-site technical support and instruction guidance can also be coordinated to ensure smooth installation.