It is designed for safety to meet fire code requirements and allows for dust and dirt to collect below your racking instead of on the shelves.
| Loading capacity 300kg | Loading capacity 800kg | Loading capacity 1000kg | |
|---|---|---|---|
| Mesh 50×150 mm | Mesh 50×100 mm | Mesh 50×100 mm | |
| Dim (D×W) (mm) | Dim (D×W) (mm) | Dim (D×W) (mm) | |
| 600×880 | 1000×880 | 1050×1090 | 1000×1340 |
| 1000×880 | 1050×880 | 800×880 | 1050×1340 |
| 1050×880 | 1100×880 | 1200×880 | 800×1340 |
| 1100×880 | 1000×1090 | 1200×1090 | 1200×1340 |
| Standard U-channel | Pallet Deck | |
|---|---|---|
| Dim (D×W) (inch) | Dim (D×W) (inch) | |
| 24"×46" | 42"×46" | 24"×46" |
| 30"×46" | 42"×52" | 36"×46" |
| 36"×34" | 42"×58" | 36"×52" |
| 36"×46" | 48"×34" | 42"×46" |
| 36"×52" | 48"×46" | 42"×52" |
| 36"×58" | 48"×52" | 44"×46" |
| 42"×34" | 48"×58" | 48"×46" |
Usage: Warehouse, supermarket, logistics.
25-30 days for Wire Mesh Decking Pallet for Pallet Racking System after receiving 30% deposit.
E-deck are specialized in material handling products/equipments, O.E.M, product development, raw materials and factory sourcing, and production planning and monitoring. In addition, we offer services in quality assurance, export documents handling and shipping coordination.
E-deck act as an extension of your own business to manage all vital aspects of your supply chain so that you can focus on your clients at ease.
Mild steel Q235.
A. Electro galvanized/Zinc plated: The zinc serves as a sacrificial anode (indoor storage).
B. Hot dip galvanized: It forms a coating of corrosion-resistant zinc (indoor/outdoor and cold storage).
C. Powder coating: A type of coating applied as a free-flowing, dry powder (indoor/outdoor storage).
In general, we have light duty (100~300kg) models, medium duty (400~800kg) models, and heavy duty (1000~1700kg) models available for your choice.
Yes, we do custom products and projects. We can manufacture based on your custom design or assist in designing the optimal model according to your dimensions, loading capacity, stackability, and operating environment.
The minimum order quantity is 1x20'GP (quantity varies depending on product size). Average production lead time is 2-3 weeks against formal order confirmation and deposit.
We offer a 3~10 years warranty subject to proper operational handling (correct forklift operation during stacking/unstacking), avoidance of overloading, and adherence to recommended environmental conditions (indoor, non-humid conditions away from corrosive chemicals for Zn-plated/powder coated products; no limitation for hot-dip galvanized finishes).