If you are interested in our products, you can contact us at any time.
| Product name | Steel structure warehouse/workshop |
| Main steel frame | H section steel beam, C section steel beam, Painted or galvanized Steel |
| Material | Q235B, Q355B |
| Bolt Accessories | Foundation bolt & High-Strength Bolts & General Bolt |
| Wall & Roof | EPS / Glass Wool / Rock Wool / PU Sandwich Panel Or Corrugated Steel Sheet |
| Door | Sliding Sandwich Panel Door / Rolling Metal Door |
| Window | Aluminium Alloy Window / PVC Window |
| Surface | Hot dip galvanized or painted |
| Other | Semi-transparent Skylight belts, Ventilators, Downpipe and Gutter |
Basic design requirements and design Load:
We can provide Installation guide service based on customers' request.
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 30 days after receiving deposit. Large order delivery time should be arranged separately.
Under conventional climate and environment, steel structure whole building 10 years, main structure 15 years, protecting system 10 years.
Strong wind region: Improve the wind-resisting ability of the internal structure.
Cold region: Increase the thickness of the wall, or use good insulation material, improve the anti-pressure ability of the structure.
High corrosion region: Use corrosion resistant material, or paint anticorrosive coating.